The images in this post are outtakes from several photo shoots in which I was hired to capture aspects of the construction process at Cohocton Wind Farm.
Above: Transmission line pole set between Cohocton Wind Farm’s two substations.
Above: Linemen positioning themselves.
Above: Welding prefabrication of substation components.
Above: Substation construction.
Above: Substation testing.
Above: Boring holes for transmission line poles.
Above: Lineman making the big stretch.
Above: Linemen positioning a transmission pole for hoisting and setting.
Above: Setting a 185,000 pound substation transformer.
Above: Linemen at work.
Above: Filling and tamping around a newly set transmission pole.
Above: Transporting a 185,000 pound substation transformer up a steep gravel site road.