CONSTRUCTION: Cohocton Wind Farm


The images in this post are outtakes from several photo shoots in which I was hired to capture aspects of the construction process at Cohocton Wind Farm.

Above: Transmission line pole set between Cohocton Wind Farm’s two substations.
Above: Linemen positioning themselves.

 
Above: Welding prefabrication of substation components.

Above: Substation construction.

Above: Substation testing.

Above: Boring holes for transmission line poles.

Above: Lineman making the big stretch.

Above: Linemen positioning a transmission pole for hoisting and setting.

Above: Setting a 185,000 pound substation transformer.

Above: Linemen at work. 

Above: Filling and tamping around a newly set transmission pole.

Above: Transporting a 185,000 pound substation transformer up a steep gravel site road.