-->

Pages

Monday, December 12, 2016

DESTINATION: Town of Victor


Above: Mountain bike receiving tuneup at Trailblazers Bike Shop. I took the images in this post for use in a merchant piece that I designed and produced for the Town of Victor, New York. The third printing of the brochure was just delivered to my customer.

Tuesday, November 15, 2016

AGRICULTURE: Fall Harvest

Above: Farming and agricultural production in Upstate New York is both vast and varied. Over four consecutive evenings in early November I photographed Steve Straight and his crew harvesting soybean crops with his John Deere Turbo 5620 combine across several fields in the region.

Saturday, October 15, 2016

PUBLICATION: ENR’s Annual Top 600 Specialty Contractors Issue

Engineering News-Record (ENR), a McGraw Hill trade publication and e-zine, featured two of our photographs in their annual Top 600 Specialty Contractors issue. Out of 12 photos supplied across the 600 featured contractors—two were ours!

ABOVE: Reclamation of fixtures from downed structure during University of Buffalo's stadium lights replacement project.

Monday, September 5, 2016

CONSTRUCTION: Cohocton Wind Farm


The images in this post are outtakes from several photo shoots in which I was hired to capture aspects of the construction process at Cohocton Wind Farm.

Above: Transmission line pole set between Cohocton Wind Farm’s two substations.

Saturday, August 20, 2016

CONSTRUCTION: UB Stadium: Lighting Replacement Project

Above: Hohl Industrial workers use an acetylene torch to dismantle one of the four original 186 foot light towers at University of Buffalo’s UB Stadium. I received called the day before the last original tower was to be dismantled and the new tower erected, hired to capture iconic brand imagery from the project.

Tuesday, March 15, 2016

FINISHED CONSTRUCTION: Ogdensburg Bridge

The Ogdensburg-Prescott International Bridge is a mile-and-a-half-long cable suspension bridge spanning the Saint Lawrence Seaway that links the north-central border of New York State with Canada. I was hired to photograph the bridge shortly after a $48 million rehabilitation project was completed. Above: About a half-hour after sunrise the sun began illuminating the bridge’s massive concrete supports.