CONSTRUCTION: Cable Installation for Historic Niagara Falls High Wire Walk


During six days in June, 2012, I was contracted to capture crews installing, securing and dismantling the 1800-foot span of custom manufactured wire rope for Nik Wallenda’s historic walk across Niagara Falls. This post contains excerpts from those photo shoots

Above: Nik’s custom manufactured wire rope stretches between the US and Canada at a final 65,000 pounds tension. I captured this image from a lift on the Canadian side less than two hours before Nik’s historic walk.

My images from six days of shooting convey the comprehensive construction process through the event and dismantlement. I delivered over 1000 digital images to my customer, O’Connell Electric Company, in addition to providing images to numerous publications for the company’s PR efforts. I also produced several select images as large format prints for display in their offices.

At the bottom of this post I have included the featured project write-up that I developed for O’Connell’s website.

Monday, June 11—United States
Below: Crews spent Day-1 together at the US site on Goat Island. They positioned vehicles and equipment, secured the cable and tensioner to micropiles (steel rods) that were driven into the bedrock and fed the cable through the tensioner.


Tuesday, June 12—Canada
Below: Day-2 started at 7:00 a.m. It turned out to be the beginning of a 27 hour shift. I spent the morning with the Canadian crew at Table Rock where they secured the cable yoke plate to micropiles, positioned the cable pulling truck and positioned the guide spool at the Fall’s edge.




Tuesday, June 12—United States
Below: At 5:30 p.m. it was back over to the US side for a strategy meeting with the helicopter crew who were flying the leader rope across the gorge. At 7:10 p.m. the helicopter lifted off and the deed was accomplished in less than 10 minutes. I spent the next five hours with the US crew until they had the cable and leader suspended over the precipice of the American Falls.



Tuesday, June 12 / Wednesday, June 13—Canada
Below: After mitigating some technical difficulties on the other side the lead end of the cable appeared over the railing of the Canadian Visitor’s Center at 3:30 a.m. The Canadian crew spent the next five hours leveraging the cable lead through a 60 ton pulley into position on the yoke plate. 

 

Wednesday, June 13—Canada
Work couldn’t resume until the final running of Maid of The Mist was complete. I stayed on the Canadian side that night as both crews worked their way out and back over the gorge in custom designed carts securing stabilizers and a weather station to the cable. When the crews kicked-off in the early morning hours everything was in order for Event Day (see my post) including cable tension which had been increased to 65,000 pounds. Thursday was a day to relax—except for me.

Thursday, June 14—Day off  for the crews

Friday, June 15—Canada ... See my Event Day Post

__________________________________________________
Following is the Wallenda featured project writeup that I wrote for O'Connell Electrics's website—a website that I designed and developed (www.OConnellElectric.com):


Nik Wallenda’s Walk Across Niagara Falls: Cable Installation
Project Overview:
How cool would that be to walk a wire across Niagara Falls!” Those were the thoughts of a young Nik Wallenda the first time he visited the Falls with his family while his parents were performing in Buffalo. Nik admits that might sound strange to most people, but being part of the seventh generation of Wallendas who continue in the family tradition, “It’s sort of in the blood,” he says.
Fast forward about 25 years. To make his longtime dream a reality, serious lobbying of US and Canadian officials began twenty months before the walk actually took place. The New York State Assembly passed a bill that granted a onetime anti-stunting law exemption early on in the process, however Ontario Canada’s Niagara Parks Commission (NPC) didn’t grant their approval until four months before the event.
On June 15, 2012, Nik Wallenda became the first person to perform a tightrope skywalk over Niagara Falls since 1896. His successful crossing was performed in front of nearly 200,000 spectators and millions of television viewers across the world. “All my attention is focused right there on that wire and nothing else,” Nik stated. “It’s me and that wire in our own world.”
A key factor in Wallenda’s success rested on finding the right contractor to install the cable: experts who possessed the resources and equipment to rig and stabilize an 1800-foot span of wire rope without the use of guy-wires. He found what he was looking for in NECA Contractor O’Connell Electric and the IBEW Local 1249 tradesmen who work for them.
O’Connell’s Role:
O’Connell was selected to install Wallenda’s custom made wire rope from among several qualified contractors in the region.
To perform the installation, O’Connell assembled a crew of ten men who were divided into two teams, one on either side of the border. Four days prior to the event, they mobilized and began staging equipment at strategically placed anchor points where micropiles had been drilled and mortared into bedrock.
Wallenda’s 2-inch diameter custom wire rope weighed over seven pounds per linear foot, more than eight tons in all. Too heavy for a helicopter to carry across the gorge, a synthetic rope was used instead. The rope was flown from Table Rock in Canada to Terrapin Point in the US where it was secured to the pulling end of the cable. A swivel fitting allowed the cable to spin freely as it was being fed off the tensioner and keep it from becoming damaged while a turnblock provided the two-part purchase that enabled the rope to meet pulling tensions of around 30,000 pounds.
Pulling of the cable was managed through continual communications between the operator of a large tensioner on the US side, the operator of a puller anchored to the Canadian side, and several spotters who were their eyes for everything in between.
The cable made the Canadian side at 3:30 a.m. Once through the crane pulley, grips were attached to the lead end of the cable so it could be disengaged from the puller and secured in an aligned position with the anchor yoke. Four grips were then attached further back on the cable to make up the rest of the distance. By 8:40 a.m. the anchor pin was set and the cable was secure. Final cable tensioning to 65,000 pounds was achieved between the cranes on either side of the gorge. After crews finished securing the two sites, a 27-hour shift had come to a close.
After a brief rest, crews were back on the job that evening to stabilize the cable. Two by two they journeyed out onto the cable in custom-made baskets from both locations; the very path Nik would take two nights later. Working their way along the wire and out over the Falls, they inspected the cable and secured pendulum anchors every 150 feet to counteract rolling and bouncing of the wire. A small weather station was attached in the center of the wire to monitor the unpredictable micro weather conditions generated by the Falls.
During the walk itself, two O’Connell crews were staged in bucket trucks at each end of the wire. They were prepared to rush to Nik’s aid as first responders in the O’Connell baskets, if necessary. Proving to be the professional athlete that he is, no aid was required. Nik made his 25-minute trek between countries look easy. Within an hour of Nik presenting papers to Canadian customs officials, O’Connell had begun the cable dismantling process. Within 24 hours, O’Connell crews had the cable coiled back onto the truck and their equipment off of both sites, leaving no evidence that they had ever been there.
Nik has aptly stated in numerous interviews that his dream would have never been realized apart from the dedication and expertise of O’Connell Electric and the IBEW Local 1249 tradesmen. We are grateful to have had the privilege to contribute to this historic event.
Next stop, the Grand Canyon.
SUPPLEMENTAL:
A month before the walk, O’Connell installed a practice cable at the Seneca Niagara Casino that was identical to the one pulled across the Niagara River gorge for the big event, only slightly shorter. Open to the public, Nik practiced for eleven days, just a block away from the American Falls. To help simulate conditions he might encounter over the Falls, he incorporated a large, high-powered fan and fire hose spray into his daily workouts.